Wednesday, 20 April 2016




 
Underground.  friezE

 

I have begun upgrading the signage on the stations, starting with Russell Square.

I Installed the frieze which is an important back-up station identification which has been install on all sub-surface platforms

A standard  length of an station is 21.5m which means 8 panel=20m and 2 infill panels at each ends

 

 












Wednesday, 13 April 2016

STARTING TO LOOK LIKE A STATION
Now that I have the frame works, work out. I began gluing the printouts to the cardboard, I added the base colours to the concrete posts, the green, yellow and aqua markings. These markings making it easier to finish off later. Once the glue was dry I attracted it to the balsa wood next. This  giving it the thickness I required. 
After assemble  the 5 frames, I then  glue the beam at even centres  matching a photo of the station The end arches, I cut the frame in halves and glue them into a pentagon . I then used Faller seating to give me the distance between the spans I attach  balsa as the concrete lit