Rolling stock Upgrades
London Transport uses a
variety of rolling stock because London Underground lines have differing
platform lengths, signaling systems and tunnel sizes. As part of our ongoing
Tube improvements, new S-stock trains will be operating across the entire
sub-surface network by the end of 2016.

Trains currently refurbish in service
'D' stock
·
Introduced in 1980
·
280 seats per train
·
Total passenger capacity per train - 827
Upgrading the D class
I have began re-building my first Underground rolling
stock
·
removing all the sliding door
·
cut new windows in the chasse
·
upgraded the engine
·
lower the cars
·
installed a new emergences door to
the front of the driver cab
Sanding and paint still to come