Once the track went down. I started the track side detail.
First thing was to looking out of the windows my local train service noting what was sitting on the sides of the tracks
Sleepers old and new
Spare rails
Piles of dirt
Gravel etc, etc ,etc
Next was what would be found around the work
sheds
44 gallon oil drums Signals, warning signs
Workmen
Water pumps
Track sheds
Next was how was the area used
Loading trucks with a cranes, Timber platforms laid across the tracks
Retaining walls loco sheds
Station platform
Storage yards
This was my first stage of tack side details
No comments:
Post a Comment